INSTALLATION

INSTALLATION

CHECKLIST

Before installing vent system ensure that the damper plate is open and secure to prevent the damper plate from falling down and crushing the liner.

The FPI Gas Insert is installed as listed.

1)

Checkallclearancestocombustibles,(Refer

 

to sections "Minimum Fireplace Dimensions

 

and Clearances to Combustibles)

2)

Make the gas connection. (Refer to section

 

"Gas Connection")

3)

Install the 3" flue liner to the sliding

 

connector plate. (Refer to section "Flue

 

Liner Installation.")

4)

Slide the unit half way into the fi replace.

5)

Pull the vent connector plate through the

 

taperedbracketsandfastentothefrontplate.

 

Refer to section "Flue Liner Installation.")

6)

Slide the unit fully into the fi replace.

7)

Test gas pressure (Refer to section "Gas

 

Pipe Pressure Testing"). Check aeration

 

system(Refertosection"GasInsertAeration

 

System").

8)

Install standard and optional features. Refer

 

to the following sections:

 

a. Brick Panel

 

b. Lot Set

MANUFACTURED

MOBILE HOME

ADDITIONAL

REQUIREMENTS

1)Ensure that structural members are not cut or weakened during installation.

2)Ensure proper grounding using the #8 ground lug provided.

3)Appliance must be anchored to the fl oor with the supplied anchoring methods.

MATERIALS REQUIRED

No electrical power supply is required for the gas control to operate. A 120 Volt AC power cord is hooked up to the fan. Plug the 3 wire cord into a suitable receptacle. Do not cut the ground terminal off under any circumstances. When connected with 120 volts, the appliance must be electrically grounded in accordance with local codes,currentversionofCSAC22.1(inCanada) orintheabsenceoflocalcodes,withtheNational Electrical Code ANSI/NFPA 70-1987.

MINIMUM FIREPLACE

DIMENSIONS

Theminimumfireplaceclearances&dimensions for the FPI gas insert are shown in the following diagrams:

CLEARANCES TO

COMBUSTIBLES

Minimum Clearances to Combustibles

From Unit

 

Sides

A

10" / 255 mm

Ceiling

B

47.5" / 1205 mm

Mantel

C

see Dia. 2 & 3

From Standard Surround (26" x 40")

Sides

D

4" / 100 mm

Ceiling

E

41.5" / 1055 mm

Mantel

 

see Dia. 2 & 3

Max. Mantle Depth

G

12" / 305 mm

 

 

(see Dia. 2)

Hearth Height

H

0" / 0 mm

Hearth Depth

I

16" / 405 mm

Hearth Width

J

40" / 1015 mm

c. Faceplate & Trim

d. Standard Flush Door

e. Flush Trim

f. Double Screen Door

g. Flush Louvers

h. Bay Louvers

i. Bay Door

j. Bay Trim

k. Full Screen Doors

l. Hampton Cast Faceplate

m. Hampton Cast Grills

n. The Kensington Front

o. Wall Thermostat

p. Remote Control

9) Finalcheck: Before leaving this unit with the

customer, the installer must ensure that the

appliance is fi ring correctly. This includes:

A

B

C

D

E

Diagram 1

Combustible Mantel Clearances

with Bay & Flush Louvers in

Masonry and Factory Built

Fireplace Installation

a)

Clocking the appliance to ensure the

 

correct fi ring rate.

b)

Adjusting the primary air, if required, to

 

ensure that the fl ame does not carbon.

 

See "Gas Insert Aeration System"

 

section.

c)

Ensuring that the appliance is venting

 

correctly.

 

MaxLentil

Height

Depth

Width

Width

 

 

 

 

BarDepth

(rear)

(front)

 

 

A

B

C

D

E

 

Regency

9"

22"

14"

22-1/2"

26-1/2"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Countour

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Faceplate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Regency

10"

22"

15"

22-1/2"

29"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Molded

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Faceplate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Palace

10"

22"

15"

22-1/2"

29"

 

 

 

 

 

 

 

 

 

 

 

 

 

Front

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hampton

9"

22"

14"

22-1/2"

26-1/2"

 

 

 

 

Diagram 2

 

Cast

 

 

 

 

 

 

 

 

 

 

Faceplate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

U32-4 FPI Direct Vent Gas Insert

7

Page 7
Image 7
Regency U32-NG4, U32-LP4 Installation Checklist, Manufactured Mobile Home Additional Requirements, Materials Required