Flue Manifold Installation

4. Install the Terminal

Terminal seal

Check that the terminal seal is in place. For weatherboard walls, add the second seal next to the terminal seal to compensate for weather board angle.

From the outside insert the terminal into the sleeve with the marking “TOP” at the top.

The left hand side locking tie should beTerminal marked “LEFT”.

 

Locking tie

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5. Lock the ties

 

 

 

 

 

 

 

 

 

 

 

Pulling hard on the left and right hand ties,

Locking ties

clip the ties over the notches inside the

 

 

 

 

Sleeve

sleeve. You should be able to pull the ties 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or 3 notches past the starting point. Cut the

 

 

 

 

 

 

 

 

 

 

 

ties, leaving about 3/4 inch (20 mm) past the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

notch. Bend the ties back into the sleeve and

 

 

 

 

 

 

 

 

 

 

 

parallel to the wall.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.Insert Inside Connection Assembly

Push the assembly into the terminal tube, ensuring that the seal is in place on the inner tube.

Attach the inside connection with 3 screws. The inner connection can still be turned to install the screws.

3 screws

Rinnai Corporation EX17C / EX22C Manual

23

Page 23
Image 23
Rinnai EX22C, EX17C installation manual Flue Manifold Installation