Roberts Gorden CTH2-100 3.2 Coupling and Tube Assembly Continued, 4 Turbulator Installation

Models: CTH2-40 CTH2-60 CTH2-175 CTH2-150 CTH2-100 CTH2-80 CTH2-125

1 68
Download 68 pages 17.18 Kb
Page 26
Image 26
Step 6.3.2 Coupling and Tube Assembly (Continued)

CTH2-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.3.2 Coupling and Tube Assembly (Continued)

Model

Tube Length Minimum

CTH2-40

10' (3 m)

CTH2-60

20' (6 m)

CTH2-80

20' (6 m)

CTH2-100

30' (9 m)

CTH2-125

40' 12 m)

CTH2-150

50' (15 m)

CTH2-175

60' (18 m)

7' 6" ± 1'

 

(2.3 m ± .25 m)

 

10' ± 1'

 

(3 m ± .25 m)

 

Total Overall

 

Tube Length

 

Step 6.4 Turbulator Installation

Turbulator Step 6.4 Turbulator Installation

Section

Turbulator

Adapter

Tab

Turbulator Section (stainless) used in CTH2-40 heaters must be in the section of tube nearest to the burner.

T

w i s t

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the CTH2-125/150/175.

Turbulator Installation

Model

Tube Section

CTH2-40

1st 10' Section

CTH2-60

2nd 10' Section

CTH2-80

2nd 10' Section

CTH2-100

3rd 10' Section

CTH2-125

N/A

CTH2-150

N/A

CTH2-175

N/A

Description

Part Number

Turbulator Adapter

03051503

Turbulator Section

03051504

Turbulator Section (stainless)

03051505

Tube

91409XXX

Pull String

Fold tab around outside

of tube nearest to the vent to hold turbulator w i s tManual background in place. Where a vent sleeve

is used, do not fold tab.

20

Page 26
Image 26
Roberts Gorden CTH2-100, CTH2-125, CTH2-80 3.2 Coupling and Tube Assembly Continued, 4 Turbulator Installation, w i s t