Roberts Gorden CTH2-150, CTH2-125, CTH2-80, CTH2-100, CTH2-175 Roberts-GordonLLC, Table Of Contents

Models: CTH2-40 CTH2-60 CTH2-175 CTH2-150 CTH2-100 CTH2-80 CTH2-125

1 68
Download 68 pages 17.18 Kb
Page 3
Image 3
TABLE OF CONTENTS

TABLE OF CONTENTS

SECTION 1: Heater Safety

1

SECTION 9: Gas Piping

40

1.1 Manpower Requirements

1

SECTION 10: Wiring

42

1.2 Safety Labels and Their Placement

1

10.1

Line Voltage Thermostat Wiring

42

1.3 California Proposition 65

1

10.2

Low Voltage Thermostat with One Burner

42

SECTION 2: Installer Responsibility

4

10.3

Low Voltage Thermostat Wiring with Multiple Burners.

2.1

Wall Tag

4

43

 

 

2.2

Corrosive Chemicals

4

10.4

Internal Wiring

43

2.3

National Standards and Applicable Codes

4

10.5

Ladder Diagram

44

SECTION 3: Clearances to Combustibles

5

10.6

Electrical Connection to the Burner

44

3.1

Required Clearances to Combustibles

5

SECTION 11: Operation and Maintenance

45

SECTION 4: National Standards and Applicable Codes

9

11.1 Sequence of Operation

45

4.1

Gas Codes

9

11.2 To Shut Off Heater

45

4.2

Aircraft Hangars

9

11.3 To Start Heater

45

4.3

Public Garages

9

11.4 Pre-Season Maintenance and Annual Inspection

45

4.4

Electrical

9

11.5 Maintenance Checklist

46

4.5

Venting

9

SECTION 12: Troubleshooting

48

4.6

High Altitude

9

12.1

Honeywell SmartValve® II Troubleshooting

49

SECTION 5: Major Components

10

12.2

Troubleshooting Flow Chart

50

5.1

Standard Parts List

11

12.3

Manifold Gas Pressure Setting

52

SECTION 6: Heater Installation

13

SECTION 13: Replacement Parts

53

6.1

Burner Tube Installation

18

SECTION 14: General Specifications

56

6.2

Tube Clamp Package Installation

18

14.1

Material Specifications

56

6.3

Coupling and Tube Assembly

19

14.2

Heater Specifications

56

6.4

Turbulator Installation

20

14.3

Suspension Specifications

56

6.5

Reflector Installation

21

14.4

Controls Specifications

56

6.6

Burner Installation

23

SECTION 15: The ROBERTS GORDON® VANTAGE® II

 

SECTION 7: Optional Heater Accessories

24

 

Warranty

57

7.1 U-Tube Configuration

24

 

 

 

7.2 Elbow Package Configuration

28

 

 

 

7.3 Reflector Side Extension

30

 

 

 

7.4 Lower Clearance Shield Installation

31

 

 

 

7.5 Two-Foot Decorative Grille Installation

31

 

 

 

7.6 Protective Grille Installation

33

 

 

 

SECTION 8: Venting

34

 

 

 

8.1

General Venting Requirements

34

 

 

 

8.2

Unvented Operation

34

 

 

 

8.3

Horizontal Venting

35

 

 

 

8.4

Vertical Venting

35

 

 

 

8.5

Unvented Operation Tube Termination

35

 

 

 

8.6

Length Requirements

35

 

 

 

8.7

Horizontal Ventilation 4" (10 cm) Pipe

35

 

 

 

8.8

Vertical Ventilation 4" (10 cm) Pipe

36

 

 

 

8.9

Common Sidewall Venting

36

 

 

 

8.10 Common Vertical Venting

37

 

 

 

8.11 Outside Combustion Air Supply

38

 

 

 

© 2012 Roberts-Gordon LLC

All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Roberts-Gordon LLC.

Printed in U.S.A.

Page 3
Image 3
Roberts Gorden CTH2-150, CTH2-125, CTH2-80, CTH2-100, CTH2-175, CTH2-40 CTH2-60 Roberts-GordonLLC, Table Of Contents