Roberts Gorden TF-Series service manual Tf-Seriesassembly Overview, on Page 10, Figure

Models: TF-Series

1 44
Download 44 pages 59.4 Kb
Page 11
Image 11
TF-SERIES ASSEMBLY OVERVIEW

ROBERTS GOR DON® TF-SE RIE S SUB MI TT AL SHEE T

TF-SERIES ASSEMBLY OVERVIEW

Major Component Descriptions

Burner with Tube Gasket

Reflector

Must be installed with the

(Aluminum or

flame observation

Stainless

window facing down.

Steel)

 

Alternate overlap as

 

shown on overview and

 

on Page 10, Figure .

 

Minimum overlap is 7” (18 cm).

Burner Tube

Tube

Supplied in 10'

Hot Rolled or Heat

(3 m) lengths. Burner

Treated Aluminized Tube

tube is always the first tube

Supplied in 10’ (3 m) lengths.

after the burner.

 

Reflector End Cap

Coupling Assembly

Punch out center

with Lock

section to

 

accommodate heat

 

exchanger tube.

 

Tube and Reflector Hanger with Clamp Package Position this hanger no more than 4” (10 cm) away from the burner.

Flexible Boot

Flexible boot is used to connect the last tube to the vent.

Tube and Reflector Hanger Suspend system from these hangers.

Reflector Support Strap & Wire Form

Flex Gas Line with

Shut Off Cock

Vent Sleeve

Vent Sleeve installed inside flexible boot.

Turbulator on Page 10, Figure . Turbulator must be installed in the last standard section of tube. Turbulator is not required on the TF-250/ 300/350/380. For installation see Page 15, Section .

© 2004 Roberts-GordonAPPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DESIGN, INSTALLATI ON AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON® PRODUCTS ARE TO BE INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIED I N THE I NSTALLATION AND SERVICE OF GAS-FIRED HEATING EQUI PMENT.

Page 11
Image 11
Roberts Gorden TF-Series service manual Tf-Seriesassembly Overview, on Page 10, Figure