Saeco Coffee Makers SUP032BR Installation, Starting The Machine, The machine is now ready for use

Models: SUP032BR

1 88
Download 88 pages 55.44 Kb
Page 7
Image 7
INSTALLATION 5

INSTALLATION 5

1

STARTING THE MACHINE

Make sure that the main power button is not pressed in the “ON” position.

2

3

Remove the coffee bean hopper cover.

Fill the hopper with coffee beans.

Close the cover pushing it down completely.

Remove the water tank. We recommend installing the “Aqua 3ULPD´ZDWHU¿OWHU VHHSDJH 

4

5

6

Fill the tank with fresh drinking water. Do not exceed the “max” level indicated on the water tank. 2QFH¿OOHGSODFHWKHWDQNEDFNLQWR the machine.

Attach the female end of the power cord to the machine. Insert the male end into the power outlet (see data tag).

Place a container beneath the hot water spout.

7

The machine automatically primes the water circuit.

The machine is now ready for use.

Water may not be dispensed into the container.

This should not be considered a malfunction.
Press the main power button to the “ON” position.

TO ASSESS WATER HARDNESS, SEE “WATER HARDNESS MENU” ON PAGE 20.

Page 7
Image 7
Saeco Coffee Makers SUP032BR manual Installation, Starting The Machine, Remove the coffee bean hopper cover