Samsung AQ30C1(2)BC installation manual Checking and Testing Operations

Models: AQ30C1(2)BC

1 48
Download 48 pages 29.74 Kb
Page 46
Image 46
Checking and Testing Operations

COMPLETING THE INSTALLATION

Checking and Testing Operations

To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.

1Review all the following elements in the installation:

Installation site strength

Piping connection tightness to detect any gas leakages

Connection wiring

Heat-resistant insulation of the piping

Drainage

Earthing wire connection

Correct operations (follow the steps below)

2Press the On/Off button.

Result: The indicator lights on the indoor unit flash at half-second intervals.

While the indoor unit opens, the indoor unit fan runs to start.

3Press the Manual backgroundbutton.

Result: The outdoor unit operates in cooling or heating mode as following the room temperature.

4

Air flow direction

Press the

 

button and check that the air

 

 

flow blades work properly.

 

 

 

 

 

E-46

Page 46
Image 46
Samsung AQ30C1(2)BC installation manual Checking and Testing Operations