Samsung DV50F9A8GVW Connecting the Inlet Hose, Final installation checklist, METHOD1, METHOD2

Models: DV50F9A8EVW DV50F9A8EVP DV50F9A8GVW

1 132
Download 132 pages 6.31 Kb
Page 19
Image 19

Connecting the Inlet Hose

METHOD1

The dryer must be connected to the cold water faucet using the new inlet hoses. Do not use old hoses.

1.If space permits, attach the brass female end of the “Y” connector to the cold water faucet.

2.Turn the cold water faucet off.

3.Attach the straight end of long hose to “Y’ connector.

4.Using pliers, tighten the coupling with an additional two-thirds turn.

Do not overtighten, as it may damage the coupling. 5. Attach angled end of long hoses to fill the valve at the bottom of the dryer’s rear frame. Screw on coupling by hand until it is seated on fill valve connector.

6.Using pliers, tighten the coupling with an additional two-thirds turn. Do not overtighten, as it may damage the coupling.

7.Check that the water faucets are on.

8.Check for leaks around “Y” connector, faucets and hoses.

METHOD2

The dryer must be connected to the cold water faucet using the new inlet hoses. Do not use old hoses.

1.If “Y” connector cannot be attached directly to the cold water faucet, the short hose must be used.

2.Turn the cold water faucet off.

3.Attach short inlet hose to cold water faucet.

Screw on coupling by hand until it is seated on the faucet.

4.Using pliers, tighten the coupling with an additional two-thirds turn.

Do not overtighten, as it may damage the coupling. 5. Attach ‘Y” connector to brass male end of small hose. Screw on coupling by hand until it is seated on connector.

6.Using pliers, tighten the coupling with an additional two-thirds turn. Do not overtighten, as it may damage the coupling.

7.Attach angled end of long hoses to the fill valve at the bottom of the dryer rear frame. Screw on coupling by hand until it is seated on fill valve connector.

8.Using pliers, tighten the coupling with an additional two-thirds turn.

Do not overtighten, as it may damage the coupling.

9.Check that the water faucets are on.

10.Check for leaks around “Y” connector, faucets and hoses.

Final installation checklist

The dryer is plugged into an electrical outlet and grounded properly.

The exhaust ductwork is hooked up and the joints are taped.

You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.

The dryer is level and is sitting firmly on the floor.

For gas models: The gas is turned on and there are no gas leaks.

Start your dryer to confirm that it runs, heats, and shuts off.

01 installing your dryer

installing your dryer _19

F900A DRY_DV50F_USER MANUAL_DC68-03170D_EN(邀请翻译成 法语+西班牙语).indd 19

2013-1-25 9:26:49

Page 19
Image 19
Samsung DV50F9A8GVW, DV50F9A8EVP, DV50F9A8EVW Connecting the Inlet Hose, Final installation checklist, METHOD1, METHOD2