Installation
⑤ Tighten locking screw. | ❖ |
| ① To pass cables to upside of ceiling, please, |
| make about ũ60mm hole on the ceiling panel. |
② Screw surface mount bracket to ceiling with
4 screws.
⑥Connect Video, communication, power cable properly. (see next section)
③ Wire cables to terminal block and connect the terminal blocks to main unit.
ENG
English – 15