GUBDESTO BNSTALL YOUR S
(_) SOLUTION INJECTION INTO THE ALTERNATE DISCHARGE FITTING ON THE WELL PUMP
1. Turn off the electrical power to the well pump 10. In the same way as in step 9, connect the other
and turn off the gas or electric supply to the water end of the tubing to the injection fitting heater
2.Open a faucet for a few seconds, to bleed off water pressure, then close
3.Close the
NOTE: If you havea
of the pressure tank, you don't have to drain it Otherwise, drain all water from the tank.
4. Open the drain valve on the well pump, if it has
one, and remove the prime plug Close the drain valve
5.Turn a reducer bushing into the prime plug hole to reduce it to 1/4 in. pipe thread Use teflon tape or pipe dope on the outside threads
6.Put teflon tape or pipe dope on the threads of the injection fitting and turn it into the reducer
bushing until tight DO NOTOVERTIGHTEN DO NOT REMOVE THE PLASTIC SLEEVE FROM
THE TIP OF THE INJECTION FITTING IT IS A
WORKING PART,
7.Set the solution dispensing system in the place you chose to locate it See page 7 for guides
8.Measure for the length of tubing needed to run from the solution pump discharge fitting, to the
injection fitting, The tubing is stiff, so allow enough length for longer bends Cut both ends of the tubing square with a sharp knife
9.Remove the nut from the discharge valve (FIG
5) on the solution pump Slide the nut over 1 end of the tubing. Push the tubing onto the tip of the discharge valve as far as it will go Then slide the holding nut onto the valve and tighten it with your fingers
11.Turn on the electrical power to the well pump and open the main water supply valve Open faucets to let air out of the water system, then close
12.Check your plumbing work for leaks
13.Turn on the gas or electric supply to the water heater and relight the pilot
SEE PAGE 11 TO MAKE THE NEEDED ELEC-
TRICAL CONNECTIONS,
Pump Head
Discharge Fitting
I