Select Comfort Precision Comfort Adjustable Foundation PROGRAMMING 2 hand controls - 1 bed

Models: Precision Comfort Adjustable Foundation

1 28
Download 28 pages 4.59 Kb
Page 19
Image 19
PROGRAMMING 2 hand controls - 1 bed

PROGRAMMING 2 hand controls - 1 bed

The three step procedure below is required to program 2 hand controls to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical

outlet.

STEP 1

Locate the power down box for the bed and press the learn button for 1 second and release (FIGURE 16).

POWER

DOWN BOX

LEARN

BUTTON

FIGURE 16: Power down box learn button.

STEP 2

On hand control 1, simultaneously press and hold the POS 1 and the head massage on/off buttons (FIGURE 17). The transmission indicator light will flash slowly and then flash rapidly. Continue to hold for 5 seconds and then release the

buttons.

STEP 3

Repeat Step 1 and Step 2 with hand control 2.

Two hand controls are now programmed to operate one bed.

HAND

HAND

CONTROL 1

CONTROL 2

TRANSMISSION

INDICATOR LIGHT

POS 1

BUTTON

HEAD MASSAGE

ON/OFF BUTTON

FIGURE 17

IF PROGRAMMINGNOTEFAILS, INITIATE THE PROGRAMMING PROCEDURE A SECOND TIME.

Precision Comfort™ Owners Manual

19

Page 19
Image 19
Select Comfort Precision Comfort Adjustable Foundation owner manual PROGRAMMING 2 hand controls - 1 bed