PROGRAMMING separating 2 beds
The six step procedure below is required to separate 2 hand controls from operating 2 beds. One hand control per bed operation will result. Before beginning, make certain the beds are plugged into a working grounded electrical outlet.
STEP 1 | STEP 6 |
| |
Locate the power down box for bed 1 and | Repeat Step 4 and Step 5 with hand control 2. | ||
press the learn button for 1 second and | Independent hand control operation is now | ||
release (FIGURE 16). | |||
restored (hand control 1 operating bed 1; | |||
| |||
| hand control 2 operating bed 2). | ||
POWER |
|
| |
DOWN BOX |
|
| |
LEARN |
|
| |
BUTTON |
|
| |
| HAND CONTROL 1 | BED 1 | |
|
|
|
Precision Comfort™ Owners Manual
22
FIGURE 16: Power down box learn button.
STEP 2
On hand control 1, simultaneously press and hold the POS 1 and the head massage on/off buttons (FIGURE 17). The transmission indicator light will flash slowly and then flash rapidly. Continue to hold for 5 seconds and
then release the buttons.
STEP 3
Repeat Step 1 and Step 2 with hand control 1.
Note: wait 90 seconds before proceeding to Step 4.
STEP 4
Locate the power down box for bed 2 and press the learn button for 1 second and release. The bed will be equipped with either a power down box or J box (FIGURE
16).
STEP 5
On hand control 2, simultaneously press and hold the POS 1 and the head massage on/off buttons (FIGURE 17). The transmission indicator light will flash slowly and then flash rapidly. Continue to hold for 5 seconds and then release the buttons.
HAND CONTROL 2 | BED 2 |
TRANSMISSION
INDICATOR LIGHT
POS 1
BUTTON
HEAD MASSAGE
ON/OFF BUTTON
FIGURE 17
IF PROGRAMMINGNOTEFAILS, INITIATE THE PROGRAMMING PROCEDURE A SECOND TIME.