PROGRAMMING 2 hand controls - 2 beds
The six step procedure below is required to program 2 hand controls to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.
STEP 1
Locate the power down box for bed 1 and press the learn button for 1 second and release (FIGURE 16).
POWER
DOWN BOX
LEARN
BUTTON
HAND CONTROL 1 | BED 1 |
FIGURE 16: Power down box learn button.
STEP 2
On hand control 1, simultaneously press and hold the POS 1 and the head massage on/off buttons (FIGURE 17). The transmission indicator light will flash slowly and then flash rapidly. Continue to hold for 5 seconds and
then release the buttons.
STEP 3
STEPRepeat4Step 1 and Step 2 with hand control 2. Locate the power down box for bed 2 and press the learn button for 1 second and
release. (FIGURE 16).
STEP 5
On hand control 1, simultaneously press and hold the POS 1 and the head massage on/off buttons (FIGURE 17). The transmission indicator light will flash slowly and then flash rapidly. Continue to hold for 5 seconds and then release the buttons.
HAND CONTROL 2 | BED 2 |
TRANSMISSION
INDICATOR LIGHT
POS 1
BUTTON
HEAD MASSAGE
ON/OFF BUTTON
FIGURE 17
IF PROGRAMMINGNOTEFAILS, INITIATE THE PROGRAMMING PROCEDURE A SECOND TIME.
Precision Comfort™ Owners Manual
21