OPERATION
Driveline Attachment
Adjusting Shaft Length
1.Slide the two halves of the shaft apart and connect the halves to the tractor PTO shaft and the mower input shaft.
2.Lay the shaft sections
3.Cut off the shield at the second mark. Now cut off the same amount of the shaft as removed from the shield and deburr the end of the shaft.
4.Cut the shield and shaft of the mower half so the same amount is removed as the tractor half. Deburr the ends, lubricate the shaft halves with grease and reassemble the halves.
5.Install the IID shaft on the tractor and mower. Raise and lower the mower to check for shaft contact
AGM | 10/10 | Operation Section |
© 2010 Alamo Group Inc.