Sharp EL-738 operation manual 10-2009, 22800, Calculating number of days, Answer 228 days

Models: EL-738

1 88
Download 88 pages 26.94 Kb
Page 54
Image 54

1 Calculating number of days

Calculate the number of days between December 25, 2008 and August 10, 2009 (using US date format and the actual calen- dar).

Procedure

Key operation

Display

Bring up the initial dis-

s

000

play in NORMAL mode.

 

 

 

 

Select day and date

K.b

 

calculations, and set all

 

M-D-Y 1=[MO]

the variables to default

 

 

1- 1-2001

values.

 

 

 

 

Make sure the actual calendar is set (360 is not displayed).

Enter the first date.

12252008 Q

M-D-Y 1=[TH]

 

 

12-25-2008

 

 

 

Enter the last date.

i8102009 Q

M-D-Y 2=[MO]

 

 

8-10-2009

 

 

 

Move to DAYS and

i@

DAYS=

calculate.

 

22800

 

 

 

 

 

Answer: 228 days

• If the 360-day calendar is selected, the answer will be 225 days.

2

Finding a date

Find the date 100 days after November 13, 2010 (using US date format and the actual calendar).

Procedure

Key operation

Display

 

 

 

Bring up the initial dis-

s

000

play in NORMAL mode.

 

 

 

 

Select day and date

K.b

 

calculations, and set all

 

M-D-Y 1=[MO]

the variables to default

 

values.

 

1- 1-2001

Make sure the actual calendar is set (360 is not displayed).

Enter the first date.

1113210 Q

 

M-D-Y 1=[SA]

 

 

 

 

11-13-2010

 

 

 

 

 

Move to DAYS and en-

ii

100

Q

DAYS=

 

ter the number of days.

 

 

 

10000

 

 

 

 

 

 

 

 

 

53

Page 54
Image 54
Sharp EL-738 operation manual 10-2009, 22800, Calculating number of days, Answer 228 days