Smith Cast Iron Boilers GS110W Condensate Piping, Heating System Piping, A- Condensate Trap

Models: GS110W

1 32
Download 32 pages 47.94 Kb
Page 15
Image 15
CONDENSATE PIPING

GS110 DIRECT VENT BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Page 15

Tout mauvais fonctionnement du systéme d'évacu- tion commun devrait étré corrigé de façor que l'installation soit conforme au National Fue Gas Code, ANSI Z223.1/NFPA 54 et (ou) aux codes d'in- stallation CSA-B149. Si la grosseur d'une section du système d' évacuation doit étré modifiée, le système devrait étré modifié pour respecter les valeurs minimales des tableaux pertinents de l'appendice F du National Fuel Gas Code, ANSI Z223.1/ NFPA 54 et (ou) des codes d'installation CSA-B149.

CONDENSATE PIPING

A small amount of condensate is generated on start up. To prevent an excess amount of condensate collecting in the flue collector a condensate drain has been provided. A condensate trap or pump MUST be connected to the condensate fitting in the bottom of the flue collector.

A trap can be made by tie wrapping a 4” loop in a piece of vinyl hose attached to the condensate drain fitting. The trap must be filled with water to prevent flue gassses from escaping, see Figures 12 A and B.

A condensate hose has been supplied with boiler and is located inside the literature bag. Installing contractor will have to continue the run of condensate to a nearby drain or pump.

Figure 12A- Condensate Trap

WARNING: Failure to connect a condensate trap or pump to the flue collector can result in excessive levels of carbon monoxide which can cause severe personal injury or death!

HEATING SYSTEM PIPING

CAUTION: All heating system piping must be installed in accordance with the ANSI/ASME Boiler and Pressure Vessel Code, Section IV. All applicable local codes and ordinances must also be followed. If the boiler is installed above any radiation elements it must be fitted with a low water cutoff device installed above the normal boiler water level!

The GS110 hot water boiler comes from the factory ready to be piped to the heating system. Each boiler is equipped with a safety relief valve which must be piped in accordance with the ANSI/ASME Boiler and Pressure Vessel Code, Section IV, see Figure 13.

Table 7 - Boiler Water Volume

Boiler

 

Water Volume

Model

 

Gallons

 

Liters

GS110-3

1.8

 

6.8

GS110-4

2.4

 

9.1

GS110-5

3.0

 

11.4

GS110-6

3.6

 

13.6

GS110-7

4.2

 

15.9

* 1-1/2 " Supply and Return Tappings

Figure 13 - Relief Valve Piping

Figure 12B- Condensate Trap

SIOM-75

Page 15
Image 15
Smith Cast Iron Boilers GS110W Condensate Piping, Heating System Piping, A- Condensate Trap, Boiler Water Volume