Page 2 | GS110 DIRECT VENT BOILER INSTALLATION AND OPERATION INSTRUCTIONS |
AVERTISSMENT.
Ne pas entreposer ni utiliser d’essence ou ni d’autres vapeurs ou liquides inflammables
àproximité de cet appareil ou de tout autre appareil.
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ:
• Ne pas tenter d’allumer d’appareil.
•Ne touchez à aucun interrupteur; ne pas vous servir des téléphones se trouvant dans le bâtiment.
•Appelez immédiatement votre fournisseur de gas depuis un voisin. Suivez les intructions du fournisseur.
•Si vous ne purvez rejoindre le fournisseur, appelez le service des incendies.
L’installation et l’entretien doivent être assurés par un installateur ou un service d’entretien qualifié ou par le fournisseur de gaz.
CONTENTS
Before You Start | page 2 |
Boiler Ratings & Capacities | page 3 |
Boiler Location | page 3 |
Clearances to Combustible Construction | page 3 |
Combustion Air & Ventilation | page 4 |
Chimney & Vent Pipe Connections | page 10 |
Heating System Piping | page 15 |
Gas Supply Piping | page 18 |
Electrical Wiring | page 18 |
Lighting Instructions | page 22 |
Boiler Set Up | page 24 |
Boiler Operation | page 24 |
Checking & Adjusting | page 25 |
Boiler Maintenance | page 26 |
Replacement Parts | page 28 |
Instructions to the Installer | page 31 |
Health Warnings | page 31 |
BEFORE YOU START |
|
WARNING: This manual must be read and fully understood before installing, operation or servicing this boiler! Failure to follow these instructions could result in a fire or explosion causing extensive property damage, personal injury or death!
These instructions cover the GS110 gas fired, direct vent, low pressure, sectional, cast iron hot water boiler. GS110 boilers have been design certified by CSA for use with natural and propane gas under the latest edition of
Each unit has been constructed and hydrostatically tested for a maximum working pressure of 30 psi in accordance with the ASME Boiler and Pressure Vessel Code, Section IV for cast iron boilers. Each boiler has been equipped with a 30 psi pressure relief valve.
This manual covers the application, installation, operation and maintenance of a GS110 low pressure hot water boiler.
To obtain the safe, dependable, efficient operation and long life for which this boiler was designed, these instructions must be read, understood and followed.
Direct all questions to your Smith Cast Iron Boiler distributor or to the Customer Service Department, 260 North Elm Street, Westfield, MA 01085. Always include the model and serial numbers from the rating plate of the boiler in question.
The owner should maintain a record of all service work performed with the date and a description of the work done. Include the name of the service organization for future reference.
Where required by the authority having jurisdiction, the installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME
If installed in the Commonwealth of Massachusetts, you MUST FOLLOW the additional instructions contained in Hydrotherm’s instruction sheet MA IOM. If you don’t have a copy, call your Hydrotherm distributor or Hydrotherm.