Ensure that the boiler is level from front to back and from side to side. Use metal shims to level the boiler. NEVER use combustible materials for shims.
Bypass Piping
CAUTION: Never connect this boiler directly to a large volume system,
CAUTION: The blend pump arrangement shown in Figure 16 must be used when the flow from any zone in a multiple zone system is less than 4 GPM or boiler short cycling on the high limit will occur!
For the three systems listed below, adjust the bypass valve to divert some of the heated water back into the boiler's return piping. When adjusted correctly the temperature of the boiler water will exceed 140°F within five minutes of a warm start. A plug valve should be used as the bypass valve for best system performance.
NOTE: Some of the circulator's capacity will be used in the blending process for the first two systems. Large heating systems may require a larger circulator.
System Bypass
The system bypass shown in Figure 14 should be used on single zone systems, or multiple zone systems using zone valves, when the circulator is installed in the return piping. The bypass must be installed between the supply and return pipes on the suction side of the circulator.
Pump Away Bypass
The system bypass shown in Figure 15 should be used on single zone systems, or multiple zone systems using zone valves, when the circulator is installed in the supply piping. The bypass must be installed between the supply and return pipes on the pressure side of the circulator.
Figure 15 - Pump Away Bypass Piping
Pumped Blend Bypass
The system bypass shown in Figure 16 should be used on multiple zone systems. The bypass must be installed between the supply and return pipes on the suction side of the zone circulators. The bypass valve must be installed on the pressure side of the bypass circulator.
Figure 16 - Pumped Bypass Piping
Figure 14 - System Bypass Piping