GS110W
NATURAL OR PROPANE GAS BOILERS INSTALLATION & OPERATION MANUAL
DESIGNED AND TESTED ACCORDING TO A.S.M.E. BOILER AND PRESSURE VESSEL CODE, SECTION IV FOR A MAXIMUM ALLOWABLE WORKING PRESSURE OF 50 PSI WATER.
TO INSTALLER
NOTE: READ THESE INSTRUCTIONS CAREFULLY. THEY
WILL SAVE YOU TIME IN ASSEMBLING BOILER PROPERLY.
WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
•Do not try to light any appliance.
•Do not touch any electrical switch. Do not use any phone in your building.
•Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
•If you cannot reach your gas supplier, call the fire department.
INSTALLER, THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE HEATER.
CONSUMER, RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE PURPOSES.
NOTE: Installation and service must be performed by a qualified installer, service agency or the gas supplier.
260 NORTH ELM STREET WESTFIELD, MA 01085 TEL. (413)