www.smoothfitness.com
9
ASSEMBLY
STEP 1: Attach the Roller Track Support Tube to the Main Frame
(A)Attach the roller track support tube (77) to the main frame (60) and secure with 2 x M10*68(78) bolts, insert the bolts through the frame then attach 2x OD20*ID10.5*2.0T curved washers (80), 2 x M10*2.0T spring washers (79), and 2 x M10*1.5*10T nut (42). Tighten the bolts now.
(B)Place the middle roller track support tube cover
(C)Place the left front stabilizer bar cover (21) over the front stabilizer and secure it with 2 x M5*16(21) screws.
(D)Repeat the above process for the right front stabilizer bar cover(22)
(E)Tighten all bolts and screws now
21 22 |
22 21 |
21 74 |
60 |
42 |
79 |
80 |
78 |
77 |