Figure 11.
A. Blower Housing
B. Arbor Cover
C.Hook
D.Clip
E.Capscrew
F.Washer, 5/l 6
G.Washer. 5/l 6
H.Spacer
I.Lockwasher, 5/l 6
J. Nut. 5/16
K.Washer, 5/16
L.Washer, 5/16
M.Locknut, 5/16
N.Wing Nut
IE | / / |
|
|
|
|
Figure 12. |
|
|
|
|
|
A. Cup |
| 0. | Wing Nut | ||
B. Lockwasher, | 5/16 | E. Locknut, | 5/16 |
| |
C. Nut. 5/16 |
| F. | Carriage | Bolt |
1 3 . Install the new baffle (A, figure 13) in deck on stone guard using existing hardware. Hardware may be installed with nut to inside or nut to outside.
|
|
I | Hdok Baffle |
| |
| Over Stone Guard |
|
|
Figure 13.
A. Baffle B. Carriage Bolt C. Mower Discharge Opening
14.Install the blower assembly as follows.
a. Pivot cover (B, figure II) away to expose the arbor.
b. Align the notch (G, figure IO) with spaceronarbor bracket. Align spacer (C, figure IO) with etch (C. figure 8) on arbor bracket. Slide the assembly into place as shown in Figure 14, while aligning front notch between cup and wing nut (D, figure 12). Tighten wing nut.
c. Place mower in low cut position. Raise the flap (A, figure 15) and install the blower drive belt(D) in the top groove of the pulley(B). (Pivot cover B. figure I I. away to expose flap.)
d. Rotate the pivotingcover(B. figure I I) into place and attach the hook (C) to the clip (D) on the housing.
Figure 14.
A. Arbor Bracket
Figure | 15. |
|
A. Flap | B. Pulley | C. Belt, |
7