MZ-R900
SECTION 3
DISASSEMBLY
• This set can be disassembled in the order shown below.
3-1. DISASSEMBLY FLOW
SET
BOTTOM | UPPER SECTION |
| “MAIN BOARD” |
“PANEL ASSY, UPPER”
| |||||
ORNAMENTAL |
|
| |||
| “CHASSIS ASSY, SET” |
|
|
|
|
|
|
|
| ||
|
|
| MOTOR, DC (SLED) (M602) |
| |
|
|
| “MOTOR, DC (SPINDLE) (M601)”, | ||
|
|
|
| “MOTOR, DC (OVER WRITE HEAD UP/DOWN) | |
|
|
|
| (M603)” |
|
Note: Follow the disassembly procedure in the numerical order given.
3-2. PANEL ASSY, BOTTOM
S801
5 two screws
(1.4)
knob (hold)
A
Note: On installation, adjust the position of
both two switches (S801, S802) and two knobs (hold).
S802
3 lid, battery case
1Open the
lid, battery case.
2 claw
4Close the
battery terminal (plus).
5two screws (1.4)
5 screw (1.4)
6Remove the “panel assy, bottom” in the direction of arrow A.
5