Marley / NC Class Stainless CoolingTower / Specifications: Base | 9 |
|
Specifications |
| Specification Value |
8.0Hot Water Distribution System:
8.1 | Two stainless steel open basins (one | ■ |
| above each bank of fill) shall receive | ers, resulting in operating pump heads of 3 to 6 meters less than that |
| hot water piped to each cell of the | encountered in counterflow towers with pressurized spray systems. |
| tower. These basins shall be installed | Also, these basins are located where they can be easily inspected— |
| and sealed at the factory, and shall be | even |
| equipped with removable, stainless |
|
| steel covers capable of withstanding |
|
| the loads described in paragraph 4.1. |
|
| All components of these basins, with |
|
| the exception of the nozzles, shall be |
|
| stainless steel. The water distribution |
|
| system shall be accessible and main- |
|
| tainable during tower fan and water |
|
| operation. |
|
8.2Each basin shall include an inlet hole and bolt circle to accept a 125# flange connection per ANSI B16.1. Removable, interchangeable polypro- pylene nozzles installed in the floor of these basins shall provide full coverage of the fill by gravity flow.
8.3 | The water distribution system shall | ■ Some manufacturers require shutting down the tower to clean the dis- |
| be accessible and maintainable while | tribution system. Can you afford to do that? |
| tower is operating. |
|
9.0 | Casing, Fan Deck and Fan Guard: | ■ Materials other than |
|
| meet your specified loading requirements. See remarks Guardrail and |
9.1 | The casing and fan deck shall be | Ladder on page 13. |
| In addition steel is excellent at resisting damage, cracking, UV and fire. | |
| be capable of withstanding the loads | |
| described in paragraph 4.1. The top of | The heavy construction of the Marley fan guard generally precludes the |
| the fan cylinder shall be equipped with | |
| a conical, | need for stainless |
| guard, fabricated of welded 8mm and | steel material. If |
| 7 gauge rods, and hot dip galvanized | you would prefer |
| after fabrication. Fan cylinders 1.5m in | these to be stain- |
| height and over shall not be required to | less steel, please |
| have a fan guard. | adjust the word- |
|
| ing of the last sen- |
|
| tence accordingly. |