RECOMMENDED TORQUE VALUES
TIE ROD NUT (A)
FLANGE ADAPTER
BOLT (B)
VALVE COVER BOLT (C)
VALVE HOUSING
BOLT (D)
ACCUMULATOR
BOLT (E)
ACCUMULATOR
CAP & PLUG (G)
ACCUMULATOR
COVER BOLT (F)
| Part Name | MBX138 | MBX208 | MBX258 | MBX308 | MBX358 | MBX408 | MBX458 | MBX608 | APPLY | |
A | Tie Rod Nut | 150 | 250 | 280 | 300 | 330 | 420 | 420 | 470 | Kopr- | |
¹, ² | 1085 ft lbs | 1808 ft lbs | 2025 ft lbs | 2170 ft lbs | 2387 ft lbs | 3038 ft lbs | 3038 ft lbs | 3400 ftlbs | Kote™ | ||
| |||||||||||
|
|
|
|
|
|
|
|
|
|
| |
B | Flange |
|
|
|
| 20 | 20 | 20 | 20 |
| |
Adapter | — | — | — | — |
| ||||||
145 ft lbs | 145 ft lbs | 145 ft lbs | 145 ft lbs |
| |||||||
| Bolt ¹ |
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| |
C | Valve Cover | — | — | — | — | 35 | 35 | 35 |
|
| |
Bolt | 253 ft lbs | 253 ft lbs | 253 ft lbs |
|
| ||||||
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
| |
D | Valve Hous- | — | — | — | — | 50 | 50 | 50 |
|
| |
ing Bolt ¹ | 361 ft lbs | 361 ft lbs | 361 ft lbs |
|
| ||||||
|
|
|
|
|
|
| |||||
E | Accumulator | — | — | — | 60 | 60 | 60 | 60 | 60 |
| |
Bolt ¹ | 434 ft lbs | 434 ft lbs | 434 ft lbs | 434 ft lbs | 434 ft lbs |
| |||||
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
| |
F | Accumulator | — | — | — | 30 | 35 | 35 | 35 | 35 | Loctite™ | |
Cover Bolt ¹ | 217 ft lbs | 253 ft lbs | 253 ft lbs | 253 ft lbs | 253 ft lbs | 242 | |||||
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |
G | Accumulator | — | — | — | 10 | 10 | 10 | 10 | 10 |
| |
Cap & Plug | 72 ft lbs | 72 ft lbs | 72 ft lbs | 72 ft lbs | 72 ft lbs |
| |||||
|
|
|
|
|
|
|
|
|
|
|
Figure B
Pre Torque Setting
¹ Tighten in a cross pattern | The torque values for TIE RODS NUTS in the above charts are |
² | intended to be used with a torque multiplier. |
Recommended Tie Rod Torque Procedure
|
| Figure A |
|
|
|
|
|
| 120° |
|
|
|
| 150° |
| MBX208 |
|
|
|
| MBX258 | MBX358 | MBX408 | MBX608 |
MBX138 | MBX308 | MBX458 | ||
The following procedure is the recommended procedure for tie rod torque and may be tightened to the specified torque using the following procedure (see figure A & B).
1.Thread tie rod into lower nut by hand until it bottoms out. Then install the upper tie rod nut and install all the way down until contacts the top of the main accumulator, then hold the upper nut from turning and with a wrench turn just the tie rod until it has a gap as shown in figure B above (0 - 1.5mm / 0 - 0.059 in., top of tie rod flush or just below top of upper tie rod nut).
2.
3.Using the illustration as a guide, mark a line on each nut and designate it as (A).
4.Using the illustration as a guide, measure the degrees indicated in the chart, for the specific model breaker, from point (A) to point (B) and make a mark near the nut. For example: If working with an MBX208, the degrees listed in figure A for turning the nut to achieve the final torque are listed as
5.Continue this procedure in a cross pattern on all 4 nuts.
28 ► MAXFORCE BREAKER User Manual