22
InstallatIon of vent sYsteM, sIdewall
Withtherouteoftheventingsystemandselectionofmaterialscompleted,
as discussed in the section of this manual titled PLANNING THE VENT
SYSTEM,thethroughthewallventterminalinplaceandtherstsection
ofpiping,uptorstelbow,installedatthebloweritistimetocompletethe
installationoftheventingsystemforthesidewallinstallation.
FIGURE 22.
Beforecompletingtheinstallationoftheventingsystembesuretoread
thesectionsofthismanualdiscussingthepropermethodofcuttingand
cementingPVCpipeandttings:VENTPIPEPREPARATION.
Itisrecommendedthatthecompletionoftheventingsystemstartat
theblowerassemblyandruntothecouplingontheinsidewallofthe
ventterminal,Figure18A.
Thevent system piping should be supported every 5 feet (1.5 m)
of vertical run and every 3 feet (91cm)ofhorizontal run.All piping
andttingsmust bejoinedby theproper proceduresasdescribed
under: VENT PIPE PREPARATION.
InstallatIon of vertIcal vent sYsteM
Aproperashingor“BOOT”shouldbeusedtosealthepipewhereit
exitstheroof.Thetotalventsystemshouldnotexceedtheequivalent
feetofpipeaslistedinTable1.
Providesupport for all pipe protruding through the roof.All piping
shouldbe properly secured. The vent system piping should be
supportedevery5feet(1.5m)of vertical run and every 3 feet (91cm)
ofhorizontalrun.Allpipingandttingsmustbejoinedbytheproper
proceduresasdescribedunder:VENTPIPEPREPARATION.
FIGURE 23.
IMportant
Theventsystemmustterminatesothatproperclearancesare
maintained as cited in local codes or the current edition of the
Nation al F uel  Ga s Co de (ANSI Z223.1) or the Natural Gas and
PropaneInstallationCode(CAN/CSA-B149.1)andaslistedbelow:
1. VentTerminationmustextendaminimumof18inches(46cm)above
roofor18inches(46cm)abovetheanticipatedsnowleveltoprevent
blockageoftheventtermination,asshowninFigures20and21.
concentrIc vent InstallatIon
Thisapplianceiscertiedforconcentricventingwithconcentricvent
kit#9003910105.Followinstruct ionsbelowforproperinstallations.
KIt coMponents
Eachkitiscomprisedofthefollowing:
Item Description Qty.
Rain Cap 3 in. 1
SDR-26 pipe 4 in. dia. 1
SDR-26 pipe 2½ in. dia. 1
Y Concentric Fitting 3 in. 1
Installation Instructions 194504 1
Fieldsupplied pipe and fittings are required to complete the
installation.