Manuals
/
State Industries
/
Household Appliance
/
Water Heater
State Industries
GS675YRVIT, GS675HRVIT instruction manual Troubleshooting Guidelines
Models:
GS675HRVIT
GS675YRVIT
1
32
36
36
Download
36 pages
18 Kb
29
30
31
32
33
34
35
36
<
>
Troubleshooting
Install
Repair Parts List
Power Vent Wiring Schematic
Replacement Parts And Deliming Products
Warranty
Maintenance
Problem
Blower Assembly
D. Inspection, cleaning, priming
Page 32
Image 32
TROUBLESHOOTING GUIDELINES
These guidelines should be utilized by a qualified service agent.
32
Page 31
Page 33
Page 32
Image 32
Page 31
Page 33
Contents
Instruction Manual
For Your Safety
whenever maintenance adjustment or service is required
RESIDENTIAL GAS WATER HEATERS
SAFE INSTALLATION, USE AND SERVICE
IMPORTANT DEFINITIONS
GENERAL SAFETY
GENERAL SAFETY
TABLE OF CONTENTS
INTRODUCTION
Preparing for the Installation
TO INSTALL OR OPERATE THE WATER HEATER
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS
TYPICAL INSTALLATION
REPLACEMENT PARTS AND DELIMING PRODUCTS
MIXING VALVE USAGE
TYPICAL INSTALLATION
LOCATING THE NEW WATER HEATER
Facts to Consider About the Location
INSULATION BLANKETS
A. ALL AIR FROM INSIDE BUILDINGS See Figure 5 and
FIGURE 8B
INSTALLING THE NEW WATER HEATER
CHEMICAL VAPOR CORROSION
Water Piping
CLOSED WATER SYSTEMS
Water Damage Hazard
Explosion Hazard
T & P Valve and Pipe Insulation if supplied
T&P Valve Discharge Pipe Requirements
FIGURE 13. GAS PIPING WITH ALL BLACK IRON PIPE TO GAS CONTROL
FIGURE 12. GAS PIPING WITH FLEXIBLE CONNECTOR
Gas Piping
VENTING VENT PIPE TERMINATION
SEDIMENT TRAPS DRIP LEGS
Filling the Water Heater
If using 3 inch vent pipe
If using 4 inch vent pipe
VENT HOODS MAY BE EXTREMELY HOT DURING OPERATION
Number of
CONDENSATE
BLOWER ASSEMBLY INSTALLATION
FIGURE 16. BLOWER ASSEMBLY
FIGURE 17. VENT TERMINATION
INSTALLATION OF VENT SYSTEM
VENT TERMINAL INSTALLATION, SIDEWALL
FIGURE 18. POWER VENT WIRING SCHEMATIC
INSTALLATION OF VENT SYSTEM, SIDEWALL
INSTALLATION OF VERTICAL VENT SYSTEM
1. INITIAL PREPARATION
2. SELECTION OF MATERIALS
PRIMER
CEMENT
D. Inspection, cleaning, priming
STEP E F. Joint assembly
STEP F G. Cleanup and joint movement
B. Deburring
FOR YOUR SAFETY READ BEFORE OPERATING
WARNING TURN OFF ALL ELECTRIC POWER BEFORE SERVICING
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
TEMPERATURE REGULATION
FOR YOUR INFORMATION
HIGH WATER TEMPERATURE SHUT OFF SYSTEM
SMOKE/ODOR
THERMAL EXPANSION
PERIODIC MAINTENANCE
Burner Cleaning
Venting System Inspection
Burner OPERATION AND Inspection
Temperature-Pressure Relief Valve Operation
ANODE ROD INSPECTION
Draining
ANODE ROD DEPLETION DETAIL
LEAKAGE CHECKPOINTS
Service
REPAIR PARTS LIST
PROPANE BURNER ASSEMBLY
NATURAL GAS BURNER ASSEMBLY
Blower Assembly
TROUBLESHOOTING GUIDELINES
PROBLEM
SOLUTION
LED STATUS
LED STATUS
PROBLEM
SOLUTION
TROUBLESHOOTING GUIDELINES
These guidelines should be utilized by a qualified service agent
Page
Page
IMPORTANT INFORMATION
LIMITED RESIDENTIAL GAS WARRANTY
CONDITIONS AND EXCEPTIONS
500 Tennessee Waltz Parkway Ashland City, TN