Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded
Wait until the conveying procedure has stopped
SSK-3 4.2.2. Adjust the flap switch
Cleaning the hopper
SSK-3 1.1. Warnings and symbols
Safety
Page 1
Image 1
Operating Instructions
Conveyor Hopper
SSK-3
SM3-610
Sterling Material Processing
Page 2
Page 1
Image 1
Page 2
Contents
Operating Instructions Conveyor Hopper SSK-3
Sterling Material Processing
SM3-610
SSK-3 Sterling Material Processing
Technical service
Telephone 800 Edition 12/97
SM3-610
SSK-3
Sales and Contracting Department
Parts and Service Department
1. Safety instructions
Table of contents
2. Installation instructions
3. Functional description 4. Maintenance
Safety instructions
1. Safety instructions
SSK-3
Safety instructions
SSK-3 1.1. Warnings and symbols
SSK-3 1.2. Explanations and information
∙ ∙ ∙ ∙ ∙ ∙
Safety instructions
1.4. For the safety of the equipment
SSK-3 1.3. For your safety
Safety instructions
Installation instructions
2. Installation instructions
SSK-3
2.2. Set-up
SSK-3 2.1. Transport
Installation instructions
Installation instructions
Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded
SSK-3
Installation instructions
SSK-3 2.3. Compressed-air supply only with compressed-air valves
Installation instructions
SSK-3 2.4. Electrical connection
The rules of the local electricity board must be observed
SSK-3
Installation instructions
SM3-610
Functional description
3. Functional description
SSK-3
Maintenance
4. Maintenance
SSK-3
Maintenance
Please observe the maintenance intervals
SSK-3
Maintenance
4.1. Maintenance intervals
Daily
Wait until the conveying procedure has stopped
SSK-3 4.2. Disassembling the hopper
Maintenance
SSK-3
Maintenance
Disassemble the material line on the lateral inlet of the hopper
Disassemble the hopper
Maintenance
SSK-3 4.2.1. Replace the sealing rings Nonreturn valve
Fold the hopper lid upwards
F Observe the direction of installation B Install the hopper
SSK-3 Outlet flap
Maintenance
AB Installation sealing ring
Maintenance
SSK-3 4.2.2. Adjust the flap switch
Maintenance
4.2.3. Cleaning the hopper
SSK-3
Spare parts list
5. Spare parts list
SSK-3
29253
SSK-3
Spare parts list
97704 ∅ 50 mm 05956 ∅ 40 mm
26487
6.1. Dimension sheet
6. Technical data
Technical data
SSK-3