Dimension
Maintenance
Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded
Wait until the conveying procedure has stopped
SSK-3 4.2.2. Adjust the flap switch
Cleaning the hopper
SSK-3 1.1. Warnings and symbols
Safety
Page 27
Image 27
SSK-3
97704 (
∅
50 mm)
05956 (
∅
40 mm)
26487
28628
29252
23092
28621
28634
26462
29570
23091
28626
28625
SM3-610
Spare parts list 26
Page 26
Page 28
Page 27
Image 27
Page 26
Page 28
Contents
Sterling Material Processing
Operating Instructions Conveyor Hopper SSK-3
SM3-610
SM3-610
Technical service
SSK-3 Sterling Material Processing
Telephone 800 Edition 12/97
SSK-3
Sales and Contracting Department
Parts and Service Department
3. Functional description 4. Maintenance
Table of contents
1. Safety instructions
2. Installation instructions
1. Safety instructions
Safety instructions
SSK-3
Safety instructions
SSK-3 1.1. Warnings and symbols
∙ ∙ ∙ ∙ ∙ ∙
SSK-3 1.2. Explanations and information
Safety instructions
SSK-3 1.3. For your safety
1.4. For the safety of the equipment
Safety instructions
2. Installation instructions
Installation instructions
SSK-3
SSK-3 2.1. Transport
2.2. Set-up
Installation instructions
Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded
Installation instructions
SSK-3
Installation instructions
SSK-3 2.3. Compressed-air supply only with compressed-air valves
SSK-3 2.4. Electrical connection
Installation instructions
The rules of the local electricity board must be observed
Installation instructions
SSK-3
SM3-610
3. Functional description
Functional description
SSK-3
4. Maintenance
Maintenance
SSK-3
Please observe the maintenance intervals
Maintenance
SSK-3
4.1. Maintenance intervals
Maintenance
Daily
SSK-3 4.2. Disassembling the hopper
Wait until the conveying procedure has stopped
Maintenance
Disassemble the hopper
Maintenance
SSK-3
Disassemble the material line on the lateral inlet of the hopper
SSK-3 4.2.1. Replace the sealing rings Nonreturn valve
Maintenance
Fold the hopper lid upwards
AB Installation sealing ring
SSK-3 Outlet flap
F Observe the direction of installation B Install the hopper
Maintenance
Maintenance
SSK-3 4.2.2. Adjust the flap switch
4.2.3. Cleaning the hopper
Maintenance
SSK-3
29253
5. Spare parts list
Spare parts list
SSK-3
26487
Spare parts list
SSK-3
97704 ∅ 50 mm 05956 ∅ 40 mm
SSK-3
6. Technical data
6.1. Dimension sheet
Technical data