SSK-3

4.1. Maintenance intervals

 

Daily:

Check warning signs on equipment for good

 

legibility and completeness.

 

With compressed-air valve:

 

check the oil level in the oiler

 

empty the water separator

 

check the operating pressure in the factory

 

ductwork system

 

(max. 6 bar (87.02 PSI) system overpressure)

Every six months:

Check all electrical and mechanical

 

connections for proper fit

 

Check the settings of the level probes

 

Check the sealing rings on the locking flaps

Yearly:

Replace the sealing rings on the locking flaps

SM3-610

Maintenance 18

Page 19
Image 19
Sterling SSk-3 operating instructions Maintenance intervals