Sterling SSk-3 operating instructions SSK-3, Installation instructions

Models: SSk-3

1 28
Download 28 pages 50.69 Kb
Page 12
Image 12
Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded.

SSK-3

Mount the hopper loader in such a way that the outlet flap swings in a right-hand angle to the direction of machine movement. Please check during assembly that the admissible bearing loads are not exceeded.

Please check that all connecting points are tight to ensure that the conveying per- formance is not impaired.

It should moreover be observed, particularly if custom produced connecting parts are used, that the material discharged from the hopper loader must neither get into the open nor must it clog the filter surfaces (observe angle of repose!).

F

Do not excessively load inlet nozzle of hopper loader, remove hose separately, if necessary!

SM3-610

Installation instructions 11

Page 12
Image 12
Sterling SSk-3 operating instructions SSK-3, Installation instructions