Sterling SSk-3 operating instructions SSK-3 2.4. Electrical connection, Installation instructions

Models: SSk-3

1 28
Download 28 pages 50.69 Kb
Page 14
Image 14
SSK-3

SSK-3

2.4. Electrical connection

»

The electrical connection may only be carried out by trained per- sonnel.

Other persons are not permitted to carry out the electrical con- nection.

The rules of the local electricity board must be observed.

Before beginning the electrical connection, make sure that the mains voltage and the power frequency are in accordance with the data on the name plate of the device.

All work may only be carried out when the unit is at zero voltage and at zero pressure.

SM3-610

Connection point diaphragm valve (SV) Connection point SKW

Connection point probe

Connection plug “flap switch (KL)”

Connection plug “conveyor control”

Plug connection connection housing hopper

Installation instructions 13

Page 14
Image 14
Sterling SSk-3 SSK-3 2.4. Electrical connection, The rules of the local electricity board must be observed