8.Install the Door Panels

Top Track/Rail supérieur/Carril superior

Roller/Rouleau/Rueda

 

Outside Rail

Inside Rail

Rail extérieur

Riel exterior

Rail intérieur

 

Riel interior

 

Outside Panel

Inside Panel Panneau extérieur Panneau intérieur Panel exterior Panel interior

Bottom Track Leg

Pied de rail inférieur

Pata del carril inferior

Inside of Bath/Shower

Intérieur de baignoire/douche

Interior de la bañera/ducha

Roller

Rouleau

Rueda

Inside of Bath/Shower Intérieur de baignoire/douche Interior de la bañera/ducha

NOTE: Perform these installation steps from outside the bath/shower.

Install the Inside Panel

Lift the inside door panel with the rollers facing away from you.

Position the rollers on the inside rail of the top track.

Check the panel for proper alignment and smooth operation. Adjust as needed (directions below).

Adjusting the Rollers

Remove the door panel.

Remove the roller screw(s) from the roller(s).

Move the roller(s) to another hole in the hanger bracket.

Thread the screw(s) into the roller(s) and tighten.

Tighten the screws and reinstall the panel.

Install the Outside Panel

Lift the outside door panel with the rollers facing you and position the rollers on the outside rail.

Check the panel for proper alignment and smooth operation. If adjustment is needed, follow the adjustment directions above.

Sterling

17

1063216-2-E

Page 17
Image 17
Sterling Plumbing 5400 Series manual Install the Door Panels, Install the Inside Panel, Adjusting the Rollers