2-5 Overhead Process Considerations
If your application has chilled water or process piping above the reservoir fill and vent level, install a standpipe to a point 1’ (30 cm) above the highest point in the system.
In applications where the process or its piping is 15 feet (4.6 m) or more above the reservoir, you must take steps to prevent
To prevent this, install a check valve in the unit breaker at the high point of the return
more information.
TO PROCESS line and a vacuum line. See Figure 7 below for
Note: The reserve capacity of the reservoir can hold a volume equal to 20 feet (6.1 m)
of 1-inch (2.5 cm) pipe.
Figure 7: Overhead Piping
The reservoir vent & fill line | Vent |
| Vacuum Breaker | |
to be piped 12" above the highest |
|
|
| Assembly |
point of the system. The vent line |
|
|
| Cap |
must remain open to the atmosphere. | 12" | Check |
| |
|
|
| ||
|
|
| 1/8" | |
|
|
| Valve | |
|
|
|
| Hole |
|
| 1/4" |
|
|
|
|
|
| 6" Min. |
|
|
|
| Process Return |
|
| Strainer |
| Process Supply |
Add check valve if system piping extends 15 feet above reservoir.