Chiller Installation

2

Chiller Installation

 

 

2-1 Electrical Connections

Check serial tag voltage and amperage requirements and make sure your electrical service conforms. See Figure 5 on page 13 for total running amps.

Bring properly sized power leads and ground from a fused disconnect (installed by your electrician) to the main power terminal in the chiller's electrical enclosure.

;Electrical connections must comply with all applicable electrical codes

;The chiller must be grounded in accordance with NEC Article 250

;Voltage must be within 10% of the chiller's nameplate rating.

2-2 Process Water Connections

;All external chilled water connections to the process must be of adequate size.

;See Figure 7 on page See 17 for sizing recommendations.

;The largest possible openings and passages should be provided for the flow of chilled water through platens, dies, molds or other pieces of equipment.

IMPORTANT!

Keep any pressure drop in external process piping to an absolute minimum for optimum unit operation.

To Process

Connect the TO PROCESS chilled water supply outlet to the process being cooled.

From Process

Connect the FROM PROCESS chilled water return inlet to the return from the process back into the chiller for cooling and recirculation.

;Sterling, Inc. recommends a strainer on the FROM PROCESS return line.