Stovax Ceramica Manhattan Wood Stove manual Commissioning, Installation Instructions

Models: Ceramica Manhattan Wood Stove

1 27
Download 27 pages 20.9 Kb
Page 19
Image 19
COMMISSIONING

INSTALLATION INSTRUCTIONS

COMMISSIONING

1.COMMISSIONING

1.1Having run the gas supply to the stove, PURGE THE SUPPLY PIPE, this is essential to expel any debris that may block the gas controls. Connect the gas supply to the 8mm compression elbow at the RH rear corner of the stove, see diagram 1.

1.2Connect a suitable pressure gauge to the test point located on the inlet fitting, and turn the gas supply on. Light the appliance and check all gas joints for possible leaks. Turn the appliance to maximum and check that the supply pressure is as stated on the data badge. Turn the gas off and replace the test point screw, turn the gas on and check the test point for leaks.

1

AR0934

1.3Check that the installation instructions and any local regulations are complied with. Check that all seals are in good condition. Complete the Appliance Commissioning Checklist at the front of these Instructions. Explain the operation of the appliance to the end user.

Hand the completed instructions to the User for safe keeping, as the information will be required when making any guarantee claims.

19

Page 19
Image 19
Stovax Ceramica Manhattan Wood Stove manual Commissioning, Installation Instructions