Stovax Ceramica Manhattan Wood Stove Installation Instructions, Site Requirements, All Appliances

Models: Ceramica Manhattan Wood Stove

1 27
Download 27 pages 20.9 Kb
Page 10
Image 10
1.5TOP FLUE UP & OUT WITH ADDITIONAL BEND

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

1.5TOP FLUE UP & OUT WITH ADDITIONAL BEND

Any additional bend may be used on the horizontal section (either 45° or 90°) but the overall horizontal flue run will be reduced.

Refer to diagram 4.

4

AR1300

1.6TOP FLUE VERTICAL KIT (8524/8524AN) -

ALL APPLIANCES

Vertical from the top of the appliance. (See diagram 5). A minimum vertical rise of 3m (9'10") to a maximum of 10m (32'10")

The basic kit comprises: 2 x 1m lengths

1 x 1m terminal lengths

1 x 52mm restrictor

1 x 47mm restrictor

Extra lengths may be added (see section 1.5), with reference to diagram 4 and the installation instructions of the appliance.

Refer to Table A under 3.3, Installation to identify when to use each restrictor.

1.7TOP FLUE VERTICAL OFFSET KIT (8530/8530AN) – ALL APPLIANCES

Used with kit 8524 only, (see diagram 5). A minimum rise of 500mm (191/2") is required to the first bend.

5

AR1299

1.8OPTIONAL EXTRA FLUE LENGTHS & BENDS

Nominal

Actual

Stainless

Anthracite

Length

Length

Finish

Finish

200mm

140mm

8527

8527AN

500mm

440mm

8528

8528AN

1000mm

940mm

8529

8529AN

45° Bend

N/A

8507

8507AN

90° Bend

N/A

8508

8508AN

Optional Flue Collar

N/A

8548

(Stoves Only)

 

 

10

Page 10
Image 10
Stovax Ceramica Manhattan Wood Stove Installation Instructions, Site Requirements, 1.6TOP FLUE VERTICAL KIT 8524/8524AN