Undercounter Installation | 13 |
subzero.com/specs
Installation Checklist
To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked.
Has all packing material been removed?
Turn the unit on. Is it operating properly? If not, is the unit plugged in? Is the control turned on?
Is the power cord plugged into a properly grounded
Has the unit been secured in place with the
Is the unit level? Are all leveling legs making contact with the floor?
Is the kickplate installed properly?
Is the water supply connected (model
Have you checked for leaks?
Is the door panel attached securely and properly aligned?
Is the door aligned for proper appearance and operation?
Have any installation or service problems been noted on the product registration card? Has the registration card been mailed in?
Has the stainless steel door or panel been inspected for any imperfections? This is to be done by the dealer or installer with the customer upon completion of the installation. Stainless steel panels are covered by a limited