Sun Microsystems SG-XPCIE2FCGBE-E-Z manual Configuring the HBA for Hot-Plug Operation

Models: SG-XPCIE2FCGBE-E-Z

1 52
Download 52 pages 18.91 Kb
Page 44
Image 44
Configuring the HBA for Hot-Plug Operation

2.If an HBA is shown as unconfigured, use the cfgadm -c configure command to configure it.

Configuring the HBA for Hot-Plug Operation

1.Locate the green Power LED indicator near the bottom of the HBA front panel (see FIGURE 2-3for LED location).

Power LED indicator status is shown in TABLE 2-6.

TABLE 2-6Power LED Status Definitions

LED State

Meaning

Removal Status

 

 

 

Off

No power to the HBA

Removal is permitted, or the HBA must be

 

 

configured

Flashing

Hot-plug in process

Removal of the HBA is not permitted

Solid green

HBA is properly configured

Removal is not permitted

 

 

 

2.If the green Power indicator is not illuminated, briefly press the Attention button near the bottom of the HBA front panel (see FIGURE 2-3for Attention button location).

The green power LED will blink for approximately five seconds and then remain on, indicating that the HBA is properly configured.

3.To cancel the operation, press the Attention button again before it stops blinking.

18 Sun StorageTek Dual 4 Gb FC Dual GbE HBA, Emulex Installation Guide • July 2008

Page 44
Image 44
Sun Microsystems SG-XPCIE2FCGBE-E-Z manual Configuring the HBA for Hot-Plug Operation