
27
Models 8752 & 8756 with Horizon®Pump Operating Procedures
SanitizingStep 1
Preparea pail of approved 100 PPM sanitizingsolution
(examples: 2--1/2gal. [9.5 liters] of Kay --5Ror2 gal.
[7.6 liters] of Stera--SheenR). USE WARM WATER
AND FOLLOW THE MANUFACTURER’S
SPECIFICATIONS. Place the pail of sanitizing
solution inside the mix cabinet.
Step 2
Place the power switch in the ON position.
Step 3
Press the PUMP key. An indicator will light, indicating
theHorizon®pump is operat ing. This action will cause
thesanitizing s olution to be pumped through the pump
andout thr ough the pressure line. After approximately
15sec onds, press the PUMP key. The light will go out
and the pump will stop operation.
Figure 45
Step 4
Drain and connect the free end of the pressure line to
the check valve.
Figure 46
Step 5
Place an empty pail beneath the door spout and raise
the prime plug.
Figure 47
Pressthe WASH and PUMP keys. Thelight s will come
on, indicating the pump and beater motor are
operating. When a steady stream of sanitizing
solution is flowing from the prime plug hole in the
bottom of the freezer door, press the PUMP key,
stopping pump operation. Push down the prime plug
and allow beater agitation for 5 minutes.
Figure 48