Percent Oxygen Analyzer

Installation 3

 

 

 

 

 

 

 

 

 

Overvoltage Category II

Installation

Installation of the analyzer includes:

1.Unpacking the system.

2.Mounting the Control Unit to a 19" Rack.

3.Installing the Micro-Fuel Cell.

4.Making the electrical connections.

5.Making the gas connections.

6.Testing the installation.

CAUTIONS:

Read this chapter in its entirety before installing the units.

 

For indoor use only.

 

The Sample must be free of entrained solids or water. How-

 

ever, a high humidity sample is ideal, since it will prevent

 

water loss from the cell electrolyte.

 

The Micro-Fuel Cell sensor electrolyte is caustic. Do not

 

attempt to open it. Leaking or exhausted cells should be

 

disposed of in accordance with local regulations. Refer to the

 

Material Safety Data Sheet in the Appendix.

 

Any damage or scarring of the delicate permeable membrane

 

on the sensing end of the cell will require cell replacement.

 

Prevent contact with membrane by any solid object.

3.1

Unpacking the Analyzer

As soon as you receive the instrument, carefully unpack and inspect Control Unit, and any included accessories for damage. Immediately report any damage to the shipping agent. The analyzer is shipped with all the materials you need to install and prepare the system for operation.

CAUTION: Do not disturb the integrity of the cell package until the cell is to actually be used. If the cell package is punctured and air is permitted to enter, cell-life will be compromised.

Teledyne Analytical Instruments

3-1

Page 17
Image 17
Teledyne 3300PA operating instructions Unpacking the Analyzer, Percent Oxygen Analyzer Installation