Trace Oxygen Analyzer | Installation 3 | |
|
|
|
|
|
|
|
|
|
Installation
Installation of the analyzer includes:
1.Unpacking the system.
2.Mounting the Control Unit to a wall
3.Installing the
4.Making the electrical connections.
5.Making the gas connections.
6.Testing the installation.
CAUTIONS: | Read this chapter in its entirety before installing the units. | ||
|
|
| The Sample must be free of entrained solids or water. How- |
|
|
| ever, a high humidity sample is ideal, since it will prevent |
|
|
| |
|
|
| |
|
|
| |
|
|
| water loss from the cell electrolyte. |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| The |
|
|
| attempt to open it. Leaking or exhausted cells should be |
|
|
| disposed of in accordance with local regulations. Refer to the |
|
|
| Material Safety Data Sheet in the Appendix. |
|
|
| Any damage or scarring of the delicate permeable membrane |
|
|
| on the sensing end of the cell will require cell replacement. |
|
|
| Prevent contact with membrane by any solid object. |
3.1Unpacking the Analyzer
As soon as you receive the instrument, carefully unpack and inspect the Unit, and any included accessories for damage. Immediately report any damage to the shipping agent. The analyzer is shipped with all the materials you need to install and prepare the system for operation.
CAUTION: Do not disturb the integrity of the cell package until the cell is to actually be used. If the cell package is punctured and air is permitted to enter,
Teledyne Analytical Instruments |