Manuals
/
Thermador
/
Kitchen Appliance
/
Cooktop
Thermador
UCV45, UNIVERSAL COOK'N'VENT, UCV30, UCV36, Cooktop, 98 installation instructions Page
Models:
98
Cooktop
UCV36
UCV30
UCV45
UNIVERSAL COOK'N'VENT
1
7
16
16
Download
16 pages
2.19 Kb
4
5
6
7
8
9
10
11
<
>
Install
Ucv Wiring Diagram Color Key
Page 7
Image 7
Page 6
Page 6
Page 8
Page 7
Image 7
Page 6
Page 8
Contents
INSTALLATION MUST COMPLY WITH ALL APPLICABLE CODES
UNIVERSAL COOK’N’VENT INSTALLATION INSTRUCTIONS
For Integral Blower Installations
For Remote Blower Installations
TABLE OF CONTENTS
SAFETY INSTRUCTIONS
READ AND SAVE THESE INSTRUCTIONS
style cooktop or range
INTRODUCTION
The complete Universal Cook‘n‘Vent
in the position closest to the duct outlet
STEP
PLAN THE INSTALLATION
PARTS INCLUDED
PARTS NEEDED
Be certain to avoid interference with gas and electric supply to cooktop
BLOWER ROTATED 90 FOR SIDE CONNECTION THROUGH WALL DUCT INSTALLATION
FIGURES 3 THROUGH 6 ARE EXAMPLES OF POSSIBLE DUCTING
ROOF MOUNT INSTALLATION
THROUGH WALL INSTALLATION
Page
PREPARE COUNTERTOP CUTOUT
TABLE 2. DUCT WORK INSTALLATION GUIDELINES
A. INSTALLATION WITH A THERMADOR COOKTOP FIGURE 7 AND TABLE
STEP
SEE PART B
UCV30/36/45 INSTALLATION DIMENSIONS WITH THERMADOR COOKTOPS
INSTALLATION WITH THERMADOR COOKTOPS WHEN SPECIFIED
TABLE 3 in inches
Refer to Table 3 Notes on previous page
B. INSTALLATION WITH ANOTHER BRAND OF COOKTOP Figure
INSTALLATION WITH OTHER COOKTOPS WHERE SPECIFIED
SEE PART B
STEP
PREPARE DUCT CUTOUTS IN CABINET
STEP
INSTALL DUCTWORK REMOTE BLOWER - if used
INSTALL ELECTRICAL SERVICE
MOUNT VENT & COOKTOP
MOUNT INTEGRAL BLOWER OR Remote Blower Transition
MOUNT INTEGRAL BLOWER OR Remote Blower Transition
UCV WIRING DIAGRAM COLOR KEY
STEP
STEP
VERIFY INSTALLATION OPERATION & COOKTOP ALIGNMENT
Down button