All installations and services must be performed by qualified service personnel.
4.BLOWER AND CONTROL PANEL WIRING
Figure 21
: TURN OFF THE ELECTRICAL POWER to the furnace before attempting to disconnect blower wiring.
DIP SWITCH (S1):
HEAT “OFF” DELAY
SW1 | SW2 |
| SECS. |
ON | ON |
| 60 SEC. |
OFF | ON |
| 90 SEC. |
*ON | OFF |
| 120 SEC. |
OFF | OFF |
| 180 SEC. |
2ND STAGE DELAY | FOR SINGLE STAGE |
| |
THERMOSTATS |
|
|
|
SW3 | MINUTES | ||
OFF | 5 MIN. |
| |
*ON | 10 MIN. |
| |
| *Factory Setting |
|
27