Thermo Products CDX1-100N, CDX1-75N, CHX1-125N Iv. Starting The Unit A. Sequence Of Operations

Models: CDX1-100N CDX1-125N CHX1-100N CHX1-75N CHX1-125N CDX1-75N

1 59
Download 59 pages 47.89 Kb
Page 35
Image 35
IV. STARTING THE UNIT

All installations and services must be performed by qualified service personnel.

IV. STARTING THE UNIT

A. SEQUENCE OF OPERATIONS

AT ANY TIME THE

 

 

 

 

 

CONTINUOUS SAFE OPERATION CHECK

GAS VALVE IS

 

 

 

 

IF FLAME SIMULATION CONDITION PRESENT OR ROLL-OUT SWITCH

NOT ENERGIZED

 

 

 

 

OPENS, SYSTEM ENERGIZES INDUCER FAN FOR 15 SECONDS AND

 

 

 

 

 

 

CIRCULATOR BLOWER AT HEATING SPEED UNTIL SITUATION CORRECTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THERMOSTAT CALLS FOR

 

 

 

 

 

 

 

 

 

 

HEAT W1 OR W1 & W2,

 

 

 

 

 

 

 

 

 

CONTACTS CLOSE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50V61-143 CONTROL

 

 

 

 

 

 

 

 

 

ENERGIZED, INDUCER

 

 

 

 

 

 

 

ENERGIZED ON HIGH SPEED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOW FIRE PRESSURE

 

 

 

 

 

SWITCHES SENSES ADEQUATE

 

 

 

 

 

 

 

DIFFERENTIAL PRESSURE,

 

 

 

 

 

 

 

 

CONTACTS CLOSE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PREPURGE IGNITION DELAY,

 

 

 

INDUCER RUNS FOR 30 SECONDS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDUCER REDUCES

 

 

 

 

 

 

 

TO LOW SPEED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOW PRESSURE SWITCH

 

 

 

 

 

 

 

SENSES ADEQUATE

 

 

 

 

 

 

PRESSURE DIFFERENTIAL,

 

 

 

 

 

 

CONTACTS STAY CLOSED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER IS APPLIED TO

 

 

 

 

 

 

THE WHITE RODGERS 768A

 

 

 

 

 

 

SILICON NITRIDE IGNITOR.

 

 

 

 

 

 

 

IGNITOR WARM-UP IS

 

 

 

 

 

 

 

20 SECONDS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29

Page 35
Image 35
Thermo Products CDX1-100N, CDX1-75N, CHX1-125N, CHX1-75N, CHX1-100N, CDX1-125N Iv. Starting The Unit A. Sequence Of Operations