Installing The Electrical Power Supply

The system requires four separate 3 phase power supplies. Power must be supplied to the CNC unit, the laser, the chiller and the dust collector. Power should be supplied from a line separate from those for welding machines and other processes that produce electrical noise. Ground rods must be installed next to the laser and CNC cabinets.

 

Laser and CNC grounding

 

 

cable gauge

at least same as power leads

 

 

grounding resistance

less than 10 ohms

 

 

 

 

A sample wiring layout is shown on the following pages.

Wiring entry and connect points are shown on pages 29.

LC3015 Theta User Installation Guide - October, 2003

27