LC3015 Theta Pre-Install Check List

(checklist page i)

Pre-Installation Checklist

This form must be completed, signed, and faxed back to Amada’s service department. This is required before installation of your Amada laser can begin.

Each of the following items must be completed prior to scheduling a service engineer for installation. Please contact the Laser Service Department if you have any questions in completing these steps.

East Coast office: Covington, GA

1-800-345-2374 Voice

1-770-787-0934 Fax

West Coast office: La Mirada, CA

1-800-334-2374 Voice

1-714-690-3248 Fax

 

 

 

￿Uncrate the machine.

￿Before placing the machine on the foundation, put all the jack bolts in place in the machine feet, and screw them down so that about 1” of the bolts extend below the bottom of the feet.

￿Do not install the anchor bolts (required) until after A.E.S.I. completes the initial installation.

It is the purchaser’s responsibility to install necessary safety devices.

Items to be Obtained:

￿Distilled Water (Koolant Kooler: 75 gallons, CKD: 100 gallons, Orion: 50 gallons)

￿Laser gas mix: two bottles. See page 9 for details.

￿Assist gas: Oxygen, Nitrogen. See page 10 for details.

Placement of the Machine and Components:

￿Plan the location of the machine, gas bottles, chiller, dust collector and any other accessory equip- ment. Take into account all the maintenance areas indicated on the floor plan.

￿Prepare the machine foundation as required.

￿The floor must be cleared of obstructions, clean and free of debris

￿Each system component has been placed according to the Pre-install Guide

￿Laser Gas bottle placed and secured from falling (25’ of gas hose is supplied)

￿Assist gases placed (50’ of gas hose is supplied for nitrogen and oxygen) (see page 10)