MAINTENANCE
Saber Maintenance Section 4-18
©2011 Alamo Group Inc.
MAINTENANCE
DRIVE SHAFT YOKE, U-JOINT 7STUB SHAFTWith engine stopped, inject Lithium-Complex
extreme pressure grease confirming to NLGI2-ISO
320 specifications into universal joints and slip yoke
until grease appears at the seal. Grease them daily
or every 8 hours.
GREASING THE BOOM SWIVELLocate the zerks on the main swivel boss (2), main
boom pivot boss (2) and on both ends of the boom
swivel cylinder. Inject Lithium-Complex Extreme
Pressure grease conforming to NLGI2-ISO 320
specification until grease begins to protrude from
ends every 8 hours.
BOOM SWIVEL