MAINTENANCE
MAINTENANCE
Decal #
Grease Schedule
Grease should meet the following recommendations:
Use SAE (NLGI) #2
IMPORTANT: Before attaching the driveline, clean and grease the tractor PTO and the Implement shaft.
Universal Joint Assemblies.
Lubricate until grease purges from underneath all four needle bearing caps.
The shield bearings are greased by a fitting molded into the shielding bell. Three pumps are required.
IMPORTANT: Check that the driveline shielding is not damaged and rotates freely on the driveline.
The housing for the CV body serves as a reservoir for the lubrication of the centering mechanism. Approximately 30 pumps are required every 4 hours.