Top Innovations SP-350 manual Steamer Operation, Preparation For Use, Filling The Water Container

Models: SP-350

1 13
Download 13 pages 51.81 Kb
Page 7
Image 7
STEAMER OPERATION

STEAMER OPERATION

STEP 1 - PREPARATION FOR USE

A.

B.

C.

Set the unit on the floor and remove the water container.

Check the inside of the container the sediment. If present rinse the container and following the Removing Mineral Buildup procedure f ou nd later in this manual.

Turn the container upside down and push the plunger valve open and allow to close two or three times to insure it is functioning smoothly.

CAUTION: DO NOT PULL ON THE PLUNGER VALVE OR YOU MAY ACCIDENTALLY REMOVE IT AND THE WATER TANK WILL NOT FUNCTION PROPERLY.

D. If the plunger is removed or falls out of the from the valve cap assembly please refer to the Reassembling The Water Tank Valve Cap procedure later in this manual.

STEP 2- FILLING THE WATER CONTAINER

NOTE: USE OF DEMATERIALIZED OR DISTILLED WATER IS HIGHLY RECOMMENDED.

A. Insure the unit is unplugged.

B.Remove the water container with the handle and turn upside down.

C.Turn the water facet in you sink o n to a mild stream

D.While depressing the valve in the center of the base, fill the tank with cool water through the opening.

NOTE: DO NOT FILL THE CONTAINER WITH HOT WATER.

E.Release the valve and install water tank o n the base.

STEP 3 -OPERATING THE STEAMER

A. Ensure the ON/OFF switch is in the OFF position. B . Plug the steamer cord into a normal electrical

outlet or approved extension cord.

C . Turn the ON/OFF switch to the O N position.

D.The switch will light when electricity is connected. E. Steam will be produced from the nozzle in a few

seconds.

CAUTION: DO NOT ALLOW THE CONTAINER TO BECOME DRY DURING OPERATION, AS THIS WILL SHORTEN THE LIFE OF THE STEAMER.

P.6

Page 7
Image 7
Top Innovations SP-350 manual Steamer Operation, Preparation For Use, Filling The Water Container, Operatingthe Steamer