Planning a UPS system should include the following considerations:

The total demand of the protected system shall dictate the output power rating (VA). Allow a margin for future expansion or calculation inaccuracies from measuring power requirements.

Backup time needed will determine the battery size needed. If the load is less than the UPS nominal power rating then the actual backup time will be longer.

The following options are available:

External Battery Cabinets, and

Connectivity options (Remote Contact, SNMP/WEB card).

The following UPS models are available.

Model

Backup time Internal

Recharge time to 90%

batteries

capacity

 

UPS 1000VA

7 min

4 hours

UPS 1500VA

6 min

4 hours

UPS 2000VA

7 min

4 hours

UPS 3000VA

6 min

4 hours

Additional External Battery Cabinets are available if more back-up time is needed.